Case Study: High Pressure Gas Installation – Cheshire
Working for BGEN - Meel Group installed multiple High-pressure gas supplies for a new pilot plant & testing facility
0 Comments
Case Study: Consultation Room Refurbishment – Newton Heath Health Centre, Manchester
Refurbishing a Healthcare Consultation room requires experience and a wide range of contractor skills.
Case Study: Laboratory Installation – Cheshire
Science lab design and installation by experienced Cheshire-based engineers. Meel Group of Macclesfield.
Case Study: School Plant Room Refurbishment – St Margaret Ward Catholic Primary School
Refurbishment of a plant room in Cheshire school.
Case Study: Quantum Science Laboratory Installation Runcorn
High-pressure gas installation within Techspace One for one of the UK's leading material science labs.